Legislature(2013 - 2014)SENATE FINANCE 532

02/18/2014 09:00 AM Senate FINANCE


Download Mp3. <- Right click and save file as

Audio Topic
09:02:48 AM Start
09:03:59 AM SB119
09:03:59 AM Fy 15 Governor's Budget Overview: University of Alaska
09:48:51 AM Fy 15 Governor's Budget Overview: Department of Health and Social Services
10:02:49 AM Fy 15 Governor's Budget Overview: Department of Transportation and Public Facilities
10:40:10 AM Fy15 Governor's Budget Overview: Court System
10:49:21 AM Adjourn
* first hearing in first committee of referral
+ teleconferenced
= bill was previously heard/scheduled
+= SB 119 BUDGET: CAPITAL TELECONFERENCED
Heard & Held
University of Alaska
Dept. of Health & Social Services
Dept. of Transportation & Public Facilities
Court System
+ Bills Previously Heard/Scheduled TELECONFERENCED
SENATE BILL NO. 119                                                                                                           
                                                                                                                                
     "An Act making appropriations, including capital                                                                           
     appropriations   and   other   appropriations;   making                                                                    
     appropriations to capitalize funds."                                                                                       
                                                                                                                                
9:03:59 AM                                                                                                                    
                                                                                                                                
^FY 15 GOVERNOR'S BUDGET OVERVIEW: UNIVERSITY OF ALASKA                                                                       
                                                                                                                                
9:03:59 AM                                                                                                                    
                                                                                                                                
PATRICK GAMBLE, PRESIDENT, UNIVERSITY OF ALASKA, introduced                                                                     
himself. He presented the PowerPoint, "FY 15 Capital Budget                                                                     
Overview" (copy on file).                                                                                                       
                                                                                                                                
President Gamble looked at slide 2, "FY 15 BOR Capital                                                                          
Request."                                                                                                                       
                                                                                                                                
     Deferred Maintenance                                                                                                       
          -No. 1 overall priority                                                                                               
          -Governor's $37.5M (last year of 5)                                                                                   
          -UAF Heat and Power Plant Upgrade                                                                                     
               -No. 1 deferred maintenance project                                                                              
                                                                                                                                
     Engineering Buildings Completion                                                                                           
          -No. 1 academic demand project                                                                                        
                                                                                                                                
     Research for Alaska                                                                                                        
          -UAF's Alaska Earthquake Center                                                                                       
          -Arctic Oil Spill Response                                                                                            
          -Statewide Digital Mapping Initiative                                                                                 
                                                                                                                                
9:10:37 AM                                                                                                                    
                                                                                                                                
President Gamble highlighted slide 3, "FY 15 Governor's                                                                         
Capital Request."                                                                                                               
                                                                                                                                
     Deferred Maintenance                                                                                                       
          -No. 1 overall priority                                                                                               
                                                                                                                                
     UAF Heat and Power Plant Upgrade . . . None                                                                                
                                                                                                                                
     Engineering Buildings Completion . . . Partial Funding                                                                     
                                                                                                                                
     Research for Alaska . . . None                                                                                             
                                                                                                                                
     Equipment . . . None                                                                                                       
                                                                                                                                
President Gamble  addressed slide  4, "University  of Alaska                                                                    
FY 15  Governor's Proposed Capital  Budget." He  stated that                                                                    
the chart  showed the governor's proposal  of $37.5 million,                                                                    
which was the  fifth year of that budget  proposal level. He                                                                    
stated  that the  beneficial value  that was  a result  from                                                                    
those five  years was of  such consequence that  he strongly                                                                    
advocated  for five  more years  dealing  with the  deferred                                                                    
maintenance  issue.  He  announced  that  the  governor  had                                                                    
prioritized deferred  maintenance, and  the majority  of the                                                                    
deferred maintenance  appropriation was allotted  five years                                                                    
prior.  The program  was  effective, and  he  was in  strong                                                                    
support of  its continuation.  He stated  that the  heat and                                                                    
power plant  was not contained  in the  governor's proposal,                                                                    
but stressed  that it  was an important  issue that  must be                                                                    
immediately addressed.                                                                                                          
                                                                                                                                
Co-Chair Meyer  queried what was  expected from  the receipt                                                                    
authority.                                                                                                                      
                                                                                                                                
MICHELLE RIZK, ASSOCIATE  VICE PRESIDENT, STATEWIDE PLANNING                                                                    
AND  BUDGET,  UNIVERSITY  OF   ALASKA,  explained  that  the                                                                    
governor included  the request in the  budget, for potential                                                                    
receipt authority.                                                                                                              
                                                                                                                                
Co-Chair  Meyer  wondered if  there  were  other sources  of                                                                    
receiving  $10  million.  President Gamble  replied  in  the                                                                    
negative.  He   explained  that  hollow  receipts   must  be                                                                    
fulfilled, or they would be moved to the following year.                                                                        
                                                                                                                                
Co-Chair Meyer noted that the  deferred maintenance in FY 14                                                                    
had been reduced  by $7.5 million. He queried  the impact of                                                                    
that  reduction, and  wondered  if that  reduction would  be                                                                    
acceptable   in  the   current   budget.  President   Gamble                                                                    
responded that  the previous year's  budget was  agreed upon                                                                    
at the last minute in order  to move forward on funding that                                                                    
was too  intense. He  stressed that UA  would be  willing to                                                                    
participate at  any level  in order  to pursue  the proposed                                                                    
budget.  He  furthered  that  the  five  years  of  deferred                                                                    
maintenance  funding  had  resulted  in  dozens  of  current                                                                    
construction  projects.  He  felt  that there  should  be  a                                                                    
balance, and  did not  feel that any  project was  of higher                                                                    
priority than the other.                                                                                                        
                                                                                                                                
9:16:55 AM                                                                                                                    
                                                                                                                                
President  Gamble   displayed  slide   5,  "FY   15  Capital                                                                    
Reality."  The slide  represented the  two projects  that he                                                                    
felt that  the legislature  would prioritize:  $37.5 million                                                                    
for deferred  maintenance; and  the engineering  versus heat                                                                    
and power plant upgrade.                                                                                                        
                                                                                                                                
Senator  Dunleavy queried  the total  estimated cost  of the                                                                    
power  plant.  President  Gamble responded  that  the  total                                                                    
estimated cost was $245 million.                                                                                                
                                                                                                                                
Senator  Dunleavy  asked the  total  cost  for each  of  the                                                                    
engineering  buildings. President  Gamble  replied that  the                                                                    
total cost for  the engineering buildings was  a little over                                                                    
$78 million.                                                                                                                    
                                                                                                                                
Co-Chair  Meyer wondered  if the  governor's  request of  $5                                                                    
million  request  for  the  new  engineering  buildings  was                                                                    
intended for any specific  project. President Gamble replied                                                                    
that  the  request  was  more  of  a  demonstration  than  a                                                                    
specific aspect of the project.                                                                                                 
                                                                                                                                
Co-Chair Meyer remarked that the  total capital budget would                                                                    
be reduced  from the  year prior. He  wanted to  ensure that                                                                    
the minimum  request from the governor  would be sufficient.                                                                    
President   Gamble  responded   that  the   two  engineering                                                                    
buildings  would  not be  identical.  The  UAA building  was                                                                    
closer  to completion  than the  UAF  building. He  stressed                                                                    
that the  UAA total  amount also  included a  parking garage                                                                    
and the renovation of the  old engineering building, and was                                                                    
totaled  into the  sum of  the request.  He felt  that there                                                                    
could be  some adjustments to  the request, in terms  of how                                                                    
the  funding would  be allotted.  Assigning  $5 million  for                                                                    
each building was not the desired approach.                                                                                     
                                                                                                                                
Co-Chair  Meyer  stressed  that  each  engineering  building                                                                    
should  be  funded simultaneously.  He  wanted  to know  the                                                                    
minimum  amount   that  would  allow  for   each  building's                                                                    
construction.  He wanted  the committee  to  work under  the                                                                    
assumption that  there was no  additional money  for capital                                                                    
projects, because  there was already  a request to  use some                                                                    
of the  savings. He  wanted to preserve  as much  savings as                                                                    
possible until there was more oil production.                                                                                   
                                                                                                                                
Co-Chair  Kelly requested  some information  from Chancellor                                                                    
Rogers. Co-Chair Meyer replied  that Chancellor Rogers would                                                                    
address   the   committee   following   President   Gamble's                                                                    
presentation.                                                                                                                   
                                                                                                                                
9:24:27 AM                                                                                                                    
                                                                                                                                
President  Gamble  discussed   slide  6,  "Alaska  Sovereign                                                                    
Education Fund."                                                                                                                
                                                                                                                                
     Alaska's Land-Grant University Equivalency                                                                                 
                                                                                                                                
     Fraction of State Earning in Oil/Gas/Mining                                                                                
                                                                                                                                
          Legislative-controlled account                                                                                        
                                                                                                                                
          Appropriated annually only to:                                                                                        
              -University Building Fund (UBF)                                                                                   
               -System-wide capital, capital maintenance,                                                                       
               equipment                                                                                                        
                                                                                                                                
          Initial Seed Money for UBF                                                                                            
               -Applied to UBF upon being signed into law                                                                       
                                                                                                                                
     Apportionment Limits (Annual)                                                                                              
          -Higher education receives first $50M                                                                                 
          -Legislature determines appropriation or savings                                                                      
          of excess                                                                                                             
                                                                                                                                
     Long Term Goal                                                                                                             
          -Modernize university technology, equipment                                                                           
          -Materially reduce facilities falling into DM                                                                         
          status                                                                                                                
                                                                                                                                
Co-Chair  Meyer  appreciated  President Gamble's  ideas  and                                                                    
suggestions.                                                                                                                    
                                                                                                                                
9:30:53 AM                                                                                                                    
                                                                                                                                
Senator  Dunleavy  surmised  that  the  land  had  not  been                                                                    
designated  from  the  state to  the  university.  President                                                                    
Gamble  responded  that   there  was  approximately  130,000                                                                    
acres, and most  of it was campus. The rest  of the land was                                                                    
divided into small  pieces across the state.  He stated that                                                                    
the university  was the second lowest  land grant university                                                                    
of all  the land grant  universities with regard to  its own                                                                    
land grant.                                                                                                                     
                                                                                                                                
Senator Dunleavy wondered if there  was a specific amount of                                                                    
land  that the  university would  receive. President  Gamble                                                                    
responded  that  the  federal government  looked  up  to  10                                                                    
million acres; and  the state had looked  at between 500,000                                                                    
and 2 million acres.                                                                                                            
                                                                                                                                
Senator  Dunleavy  queried  the  number of  acres  that  the                                                                    
university had  received, of  the 2  million acres  in state                                                                    
land. President Gamble responded  that the land allotted was                                                                    
merely what  was necessary  for the  construction of  all of                                                                    
the various  facilities across the  state. There  were other                                                                    
pieces  of land  that had  been assigned  to the  university                                                                    
through  endowments, etc.  The  130,000  acres included  the                                                                    
total  land  that the  university  had  received from  every                                                                    
aspect.                                                                                                                         
                                                                                                                                
Senator  Dunleavy wondered  if there  was a  specific figure                                                                    
articulated  from  the  state   that  the  university  would                                                                    
receive.  President  Gamble  replied  in  the  negative.  He                                                                    
explained that there  was a number agreed upon  in the 1990s                                                                    
that was sent  to the governor, but the  governor had vetoed                                                                    
that bill because of the  statement in the constitution that                                                                    
stated  that  there  could  not  be  money  allotted  for  a                                                                    
specific purpose.  The language in  the bill was  not clear,                                                                    
so the governor vetoed the bill based on a technicality.                                                                        
                                                                                                                                
Senator Dunleavy  surmised that  the state had  not conceded                                                                    
the land  to generate income  for the university,  and there                                                                    
was no  expectation of  that actually  occurring. Therefore,                                                                    
there  was a  proposed new  concept to  trade out  that land                                                                    
idea for the wealth that  the land would generate. President                                                                    
Gamble replied in the affirmative.                                                                                              
                                                                                                                                
9:34:44 AM                                                                                                                    
                                                                                                                                
Co-Chair  Kelly  remarked  that  the  issue  was  not  about                                                                    
whether UA received  land, but rather it  was never allotted                                                                    
to the university in the  first place. He explained that the                                                                    
land grant for  universities to a small  state like Delaware                                                                    
was  substantial  larger  than  the land  grant  to  UA.  He                                                                    
recalled that the federal government  had taken so much land                                                                    
that there was not  much left for UA. He felt  that UA was a                                                                    
land grant college in name  only, because the land had never                                                                    
materialized.  He stressed  that this  debate dated  back to                                                                    
1913,  and  Judge  Wickersham  had put  forward  a  bill  in                                                                    
Alaska's original legislature for  the federal government to                                                                    
cede  land to  the university.  The discussion  for Alaska's                                                                    
statehood eventually overshadowed  that legislation, and the                                                                    
land grant  for university issued continued  to present day.                                                                    
President Gamble replied that in  1959, there was a veto for                                                                    
a  million acres  of  land that  was  presented to  Governor                                                                    
Egan. Governor  Hickel then  tried to  deal with  the issue,                                                                    
but was overshadowed by the  Alaska Native Claims Settlement                                                                    
Act,  Trans-Alaska   Pipeline  System  (TAPS),   the  Alaska                                                                    
National  Interest Lands  Conservation Act,  so all  of that                                                                    
land was removed from consideration.                                                                                            
                                                                                                                                
President  Gamble  displayed  slide 7,  "FY  14  Sustainment                                                                    
Funding Plan for  UA facilities With No Additional  DM and R                                                                    
&  R funding."  He explained  that the  chart was  a running                                                                    
tally of the deferred maintenance.  He stated that the green                                                                    
bar at the bottom of  the five most recent years represented                                                                    
the governor's  $37.5 million. He  explained that  the chart                                                                    
showed  the comparison  between the  governor's request  and                                                                    
the total needs  to maintain all of  the university's square                                                                    
footage.                                                                                                                        
                                                                                                                                
Senator Bishop wondered  if UA had received  any funding for                                                                    
from  private  corporations  for  oil or  gas  line  related                                                                    
research projects.  President Gamble deferred  to Chancellor                                                                    
Rogers.                                                                                                                         
                                                                                                                                
9:39:15 AM                                                                                                                    
                                                                                                                                
BRIAN  ROGERS, CHANCELLOR,  UNIVERSITY OF  ALASKA FAIRBANKS,                                                                    
agreed  to  provide  the information  requested  by  Senator                                                                    
Bishop.                                                                                                                         
                                                                                                                                
Co-Chair  Kelly  felt  that  there  was  no  legislation  to                                                                    
designate a petroleum research fund.                                                                                            
                                                                                                                                
Senator Hoffman  noted that the  state had  provided funding                                                                    
for UA  in the lower $200  million over the last  five years                                                                    
in  deferred  maintenance.  He remarked  that  the  deferred                                                                    
maintenance would  continue to  increase to $1.4  billion by                                                                    
2028.  He  felt  that  the future  governors  would  present                                                                    
additional  requests,  even  though there  was  a  five-year                                                                    
commitment  of  $37.5  million. He  added  that  the  recent                                                                    
requests of  $200 million  still did not  cover the  bulk of                                                                    
the deferred  maintenance costs. President  Gamble expressed                                                                    
confidence  in  the  presented numbers.  He  explained  that                                                                    
there was  a specific analysis  that was conducted  in order                                                                    
to determine the requests.                                                                                                      
                                                                                                                                
Senator  Hoffman looked  at the  red  and blue  bars on  the                                                                    
slide,   and  wondered   if  there   was  anticipation   for                                                                    
additional  expenditures for  deferred maintenance  by 2018.                                                                    
President Gamble  responded that  there would  be additional                                                                    
deferred maintenance requests.                                                                                                  
                                                                                                                                
Co-Chair  Meyer asked  to have  a private  meeting with  the                                                                    
university.                                                                                                                     
                                                                                                                                
9:45:20 AM                                                                                                                    
                                                                                                                                
Chancellor  Rogers explained  that UA  had been  examining a                                                                    
range  of public-private  partnership  options  for the  UAF                                                                    
Heat  and Power  Plant. Of  the total  $245 million  capital                                                                    
cost, UA was  able to bond internally for  $50 million using                                                                    
the fuel  cost savings.  The request to  the state  was $195                                                                    
million, and $50 million from  the savings in fuel. Shifting                                                                    
to one  of four  public-private options  would shift  from a                                                                    
capital  support  to  an operating  support.  A  lease  hold                                                                    
interest or operator would be  paid, depending on the model.                                                                    
The  challenge would  be  whether to  pay  now with  capital                                                                    
funds or later with operating funds.                                                                                            
                                                                                                                                
Co-Chair  Meyer wondered  how $50  million would  be reached                                                                    
through  bonding. Chancellor  Rogers  replied  that the  $50                                                                    
million was  reached by looking  at the current  fuel costs.                                                                    
He explained  that UA paid  $9.8 million per  year currently                                                                    
for coal, oil,  gas, and electricity for its  heat and power                                                                    
needs. The new plant was  estimated at $5.3 million per year                                                                    
for power costs, therefore saving  UA $4.5 million per year.                                                                    
He stated that the funds would be  used to secure a 20 to 25                                                                    
year bond from  the university revenue in order  to make the                                                                    
new facility cost-neutral for UAF.                                                                                              
                                                                                                                                
Co-Chair  Meyer   queried  the   minimum  request   for  the                                                                    
engineering   buildings'  construction.   Chancellor  Rogers                                                                    
responded  in the  negative. He  furthered that  the request                                                                    
for $5  million would not  be sufficient to cover  the cost,                                                                    
would slow down or stop the project.                                                                                            
                                                                                                                                
^FY 15 GOVERNOR'S BUDGET OVERVIEW:  DEPARTMENT OF HEALTH and                                                                  
SOCIAL SERVICES                                                                                                               
                                                                                                                                
9:48:51 AM                                                                                                                    
                                                                                                                                
WILLIAM  STREUR,  COMMISSIONER,  DEPARTMENT  OF  HEALTH  AND                                                                    
SOCIAL   SERVICES,   (DHSS)   looked   at   the   PowerPoint                                                                    
presentation, "FY2015 Capital Budget" (copy on file).                                                                           
                                                                                                                                
Commissioner  Streur looked  at  slide 2,  "FY 2015  Capital                                                                    
Request."  He explained  that the  capital fund  request for                                                                    
DHSS was  $9.626 million.  The year  prior was  $26 million,                                                                    
and the  year before  that was $33  million. He  stated that                                                                    
DHSS  continued to  examine what  could be  done within  the                                                                    
existing   budget  and   the  commissioner's   discretionary                                                                    
authority to continue  to reduce the budget.  He stated that                                                                    
there were  six items that  DHSS would present. Four  of the                                                                    
items  were contained  in the  capital budget  bill HB  119:                                                                    
Office  of  Children's   Services  (OCS)  Safety;  Emergency                                                                    
Medical  Services  match  for Code  Blue;  non-Pioneer  Home                                                                    
deferred    maintenance;   and    Pioneer   Home    deferred                                                                    
maintenance. The  other two requests  were contained  in the                                                                    
Mental  Health  Budget  HB   267:  mental  health  essential                                                                    
program equipment; and mental  health home modifications and                                                                    
upgrades.                                                                                                                       
                                                                                                                                
Commissioner   Streur  highlighted   slide  3,   "Office  of                                                                    
Children's  Services Safety  Enhancements  - $557.7  ($462.9                                                                    
GF, $94.8 Fed)."                                                                                                                
                                                                                                                                
     Office and Building Safety:                                                                                                
          -Expand safety improvements to buildings and                                                                          
          offices as determined through ongoing safety                                                                          
          assessment                                                                                                            
                                                                                                                                
     Safety in the Field:                                                                                                       
          -Provide statewide training to current and new                                                                        
          employees                                                                                                             
          -Provide Mobile Personal Safety devices                                                                               
          -Incident Tracker                                                                                                     
                                                                                                                                
Commissioner   Streur   explained   that  some   Office   of                                                                    
Children's  Services (OCS)  employees  had some  significant                                                                    
safety concerns. He  stated that there had  been some recent                                                                    
incidents  that required  the  addition  of enhanced  safety                                                                    
precautions.                                                                                                                    
                                                                                                                                
9:53:14 AM                                                                                                                    
                                                                                                                                
Commissioner Streur looked at slide 4, "Emergency Medical                                                                       
Services Match for Code Blue Projects - $500.0 GF Match."                                                                       
                                                                                                                                
     Matches federal, local and private funds to purchase                                                                       
     critical EMS equipment and ambulances                                                                                      
                                                                                                                                
     Serves all seven EMS Regions                                                                                               
                                                                                                                                
     Regions submit requests; projects approved by Code                                                                         
     Blue Steering Committee                                                                                                    
                                                                                                                                
     Since program inception in FY2002, over $20,500.0 has                                                                      
     been leveraged                                                                                                             
                                                                                                                                
Commissioner Streur highlighted slide 5, "Mental Health                                                                         
Essential Program Equipment - $500.0 ($250.0 GF/MH, $250.0                                                                      
MMHTAAR)."                                                                                                                      
                                                                                                                                
     Competitive capital grants                                                                                                 
                                                                                                                                
     For agencies that provide services to Mental Health                                                                        
     Trust beneficiaries                                                                                                        
                                                                                                                                
     Purchases that are essential to the core services and                                                                      
     programs offered to clients                                                                                                
                                                                                                                                
    Limited to $25,000 per agency per beneficiary group                                                                         
                                                                                                                                
Commissioner Streur discussed slide 6, "Mental Health Home                                                                      
Modification and Upgrades to Retain Housing - $1,050.0                                                                          
($750.0 GF/MH, $300.0 MHTAAR)."                                                                                                 
                                                                                                                                
     Competitive capital grants                                                                                                 
                                                                                                                                
     Provides housing modifications                                                                                             
                                                                                                                                
     Allows persons with a disability to remain in their                                                                        
     homes                                                                                                                      
                                                                                                                                
    Approximately 125 families served each grant cycle                                                                          
                                                                                                                                
     Grantees coordinate efforts                                                                                                
                                                                                                                                
                                                                                                                                
Commissioner Streur highlighted slide 7, "Non-Pioneer Home                                                                      
Deferred Maintenance - $3,018.9 ($3,000.0 GF, $18.9 Fed)."                                                                      
                                                                                                                                
     Deferred maintenance projects                                                                                              
                                                                                                                                
     DHSS's 35 facilities statewide                                                                                             
                                                                                                                                
     Youth facilities, public health centers, laboratories,                                                                     
     Alaska Psychiatric Institute                                                                                               
                                                                                                                                
     Replacement value of $387,000.0                                                                                            
                                                                                                                                
Commissioner  Streur displayed  slide  8, "Fairbanks  Public                                                                    
Health Siding Repair."   The slide displayed  the before and                                                                    
after photos of the  Fairbanks Public Health Building siding                                                                    
repair project.                                                                                                                 
                                                                                                                                
Commissioner  Streur  looked  at   slide  9,  "Pioneer  Home                                                                    
Deferred Maintenance - $4,000.0 GF."                                                                                            
                                                                                                                                
     Deferred maintenance projects                                                                                              
                                                                                                                                
     Six Pioneer Homes - Ketchikan, Sitka, Juneau,                                                                              
     Anchorage, Palmer, and Fairbanks                                                                                           
                                                                                                                                
     Replacement value of $344,000.0                                                                                            
                                                                                                                                
Commissioner  Streur highlighted  slide 10,  "Juneau Pioneer                                                                    
Home  Refrigeration Upgrade."  The slide  showed the  before                                                                    
and after  photos of the  Juneau Pioneer  Home refrigeration                                                                    
upgrade project.                                                                                                                
                                                                                                                                
9:58:20 AM                                                                                                                    
                                                                                                                                
Co-Chair  Meyer  looked  at   the  Pioneer  Home's  deferred                                                                    
maintenance.  He noted  that DHSS  had received  $16 million                                                                    
under the governor's deferred  maintenance plan. He wondered                                                                    
if there  was any money  from that allocation that  could be                                                                    
used for current projects.  Commissioner Streur replied that                                                                    
there  were incremental  amounts  that were  left over  from                                                                    
year to year.  He stated that the $4  million request barely                                                                    
covered the  cost of the necessary  deferred maintenance. He                                                                    
stated  that the  Juneau  Pioneer Home  was  facing a  large                                                                    
increment, and there  was still a question as  to whether or                                                                    
not that increment was considered deferred maintenance.                                                                         
                                                                                                                                
Co-Chair Meyer  wondered how it  was determined  which areas                                                                    
of  the state  would  receive  the ambulances.  Commissioner                                                                    
Streur replied that the need, the  age of the units, and how                                                                    
well the specific request was written and supported.                                                                            
                                                                                                                                
Senator Bishop  asked if there  was a federal match  for the                                                                    
Code Blue  request. Commissioner  Streur replied  that there                                                                    
was an  80/20 federal  match. He stated  that the  Code Blue                                                                    
was a general fund (GF) request.                                                                                                
                                                                                                                                
SANA  EFIRD,  ASSISTANT   COMMISSIONER,  FINANCE  MANAGEMENT                                                                    
SERVICES,   DEPARTMENT  OF   HEALTH   AND  SOCIAL   SERVICES                                                                    
explained that the federal money  did not go directly to the                                                                    
state. The  federal money  went directly  to the  regions of                                                                    
the state that applied for the  money. The money was used to                                                                    
match the federal money that those regions received.                                                                            
                                                                                                                                
^FY   15   GOVERNOR'S   BUDGET   OVERVIEW:   DEPARTMENT   OF                                                                  
TRANSPORTATION and PUBLIC FACILITIES                                                                                          
                                                                                                                                
10:02:49 AM                                                                                                                   
                                                                                                                                
PAT  KEMP, COMMISSIONER,  DEPARTMENT  OF TRANSPORTATION  AND                                                                    
PUBLIC   FACILITIES,  (DOT/PF)   displayed  the   PowerPoint                                                                    
presentation,  "Alaska  Department   of  Transportation  and                                                                    
Public   Facilities,  FFY   2015  Proposed   Capital  Budget                                                                    
Presentation"  (copy  on  file).  He stated  that  the  last                                                                    
highway bill significantly  changed the federal allocations,                                                                    
so there  was more emphasis  on the national  highway system                                                                    
(NHS) roads  and major corridors.  There was  currently less                                                                    
funding available for the secondary  and community roads. He                                                                    
stressed  that  the  change  had  a  significant  effect  on                                                                    
DOT/PF.  He remarked  that the  department had  looked at  a                                                                    
broader picture of a ten-year  plan, and they found that the                                                                    
NHS projects  fit nicely into  that plan. He  furthered that                                                                    
the non-NHS  projects were over-prescribed, so  they must be                                                                    
reexamined.  The department  was  working with  communities,                                                                    
and  he was  confident that  the non-NHS  projects would  be                                                                    
fulfilled.  The   final  step  would  be   to  re-scope  the                                                                    
projects.                                                                                                                       
                                                                                                                                
Co-Chair Meyer  expressed that the commissioner  had done an                                                                    
excellent  job  of  maximizing the  dollars  that  had  been                                                                    
allocated.  He saw  many  positive effects  on  many of  the                                                                    
roads in his district.                                                                                                          
                                                                                                                                
JEFF  OTTESEN, DIRECTOR,  DIVISION  OF PROGRAM  DEVELOPMENT,                                                                    
DEPARTMENT   OF   TRANSPORTATION  AND   PUBLIC   FACILITIES,                                                                    
discussed slide 2, "Outline."                                                                                                   
                                                                                                                                
     -FFY 15 Request Versus Historical Funding Levels                                                                           
                                                                                                                                
     -Big issues we now face                                                                                                    
                                                                                                                                
     -Review of more prominent projects                                                                                         
                                                                                                                                
Mr. Otteson highlighted slide  3, "Federal Highway Program."                                                                    
He  stated  that the  chart  represented  all federal  funds                                                                    
received  over the  past  ten years.  He  remarked that  the                                                                    
funding was fairly  level, except in 2009,  when the federal                                                                    
stimulus package was delivered.                                                                                                 
                                                                                                                                
Mr.   Otteson  discussed   slide   4,   "State  GF   Capital                                                                    
Transportation Program." The funds  that were formerly known                                                                    
as "earmarked funds" were now delivered as "formula funds."                                                                     
                                                                                                                                
Mr.   Otteson   looked   at   slide   5,   "State   Deferred                                                                    
Maintenance." He remarked that DOT/PF  was in the fifth year                                                                    
of a  five year plan,  and the  money was divided  into five                                                                    
categories:  marine highways,  harbors, airports,  highways,                                                                    
and facilities.                                                                                                                 
                                                                                                                                
10:07:44 AM                                                                                                                   
                                                                                                                                
Mr. Otteson highlighted slide 6, "Bigger Issues We Face."                                                                       
                                                                                                                                
     MAP-21 (moving Ahead for Progress in 21st Century)                                                                         
     Changes in emphasis:                                                                                                       
          -Safety and National Highway System increased                                                                         
          -Community roads and lesser state highways                                                                            
          substantially reduced                                                                                                 
                                                                                                                                
     End of year rush to obligate                                                                                               
          -Tremendous strain on staff and FHWA                                                                                  
                                                                                                                                
     Numerous big NHS projects now reaching construction                                                                        
     stage at once                                                                                                              
                                                                                                                                
     Performance management influence                                                                                           
                                                                                                                                
     Funding adequacy                                                                                                           
                                                                                                                                
Mr.  Otteson  discussed  slide 7,  "MAP-21  Emphasis  is  to                                                                    
National  Highway System."  The  blue portion  of the  right                                                                    
chart represented the  NHS road miles, and  the blue portion                                                                    
of  the left  chart represented  the amount  of funding  for                                                                    
NHS. The same  was true for the red portions  of each chart:                                                                    
number of miles was in  the right chart, and money available                                                                    
was in the left chart. He stressed that there was a great                                                                       
disparity between the number of miles and money available.                                                                      
                                                                                                                                
Mr. Otteson looked at slide 8, "Late Funding Challenge."                                                                        
                                                                                                                                
     In 2013, we obligated >$700 million though we received                                                                     
     <$500 million in annual federal funds                                                                                      
                                                                                                                                
          Most of the extra funding came known very late in                                                                     
          the fiscal year from these sources:                                                                                   
                                                                                                                                
               Project closeouts with little grace period                                                                       
               >$100 million                                                                                                    
                                                                                                                                
               Prior year funds that would lapse >$100                                                                          
               million                                                                                                          
                                                                                                                                
               End of year redistribution >$10 million                                                                          
                                                                                                                                
     Only with pre-designed work, capital budget authority                                                                      
     and additional match funds could we successfully react                                                                     
                                                                                                                                
10:13:38 AM                                                                                                                   
                                                                                                                                
Mr. Otteson highlighted slide 9, "MAP-21 Performance                                                                            
Mandate."                                                                                                                       
                                                                                                                                
     FHWA to set National Highway System (NHS) Performance                                                                      
     Measures for:                                                                                                              
                                                                                                                                
          -Safety                                                                                                               
          -Pavements and Bridges                                                                                                
          -Freight Mobility                                                                                                     
          -Congestion                                                                                                           
          -System Performance                                                                                                   
                                                                                                                                
     If National Highway System (NHS) system conditions                                                                         
     fail to meet targets:                                                                                                      
                                                                                                                                
          -Must divert funding to better performance                                                                            
          -Later, penalized with higher match requirement                                                                       
                                                                                                                                
Mr. Otteson discussed slide 10, "Major Projects."                                                                               
                                                                                                                                
     Projects over $100 million require annually updated                                                                        
     financial plans                                                                                                            
                                                                                                                                
     Projects  over   $500  million  require   even  greater                                                                    
    requirements (e.g., Knik Arm Bridge, Juneau Access)                                                                         
                                                                                                                                
     Several of these projects now  underway or soon will be                                                                    
     ready                                                                                                                      
                                                                                                                                
     Parks, Seward, several others now in queue                                                                                 
                                                                                                                                
Mr. Otteson looked at slide 11, "Funding Adequacy."                                                                             
                                                                                                                                
     NHS  Program:  adequate  funding, but  new  performance                                                                    
     mandates and  log-jamb of bigger projects  now ready is                                                                    
     a double challenge                                                                                                         
                                                                                                                                
     STP Program:  under-funded, means too many  projects to                                                                    
     finish within federal time-trap rules                                                                                      
                                                                                                                                
     Strategies:                                                                                                                
          -Prioritize needs over wants                                                                                          
          -Reduce scope and expensive add-ons                                                                                   
          -Focus on active projects; limit new starts                                                                           
                                                                                                                                
Mr. Otteson highlighted slide 12, "Selected Projects (1)."                                                                      
                                                                                                                                
     Economic   Development:   Deadhorse   airport,   Juneau                                                                    
     Access, KABATA, Tanana road                                                                                                
                                                                                                                                
     Asset   Management  and   Deferred  Maintenance:   AMHS                                                                    
     overhaul, Off-system bridges, GF funded too                                                                                
                                                                                                                                
     Municipal Harbors: Seward and Whittier                                                                                     
                                                                                                                                
     Airports   (AIP):   AIAS,   Ambler,   Kodiak,   Seward,                                                                    
     Kwigillingok                                                                                                               
                                                                                                                                
10:20:41 AM                                                                                                                   
                                                                                                                                
Senator  Hoffman   looked  at  the  projects   for  economic                                                                    
development, which focused on  the Juneau Access Project and                                                                    
Knik Arm Bridge and Toll  Authority (KABATA). He stated that                                                                    
the request  for the Juneau Access  Project in FY 15  was $5                                                                    
million in GF, and $30  million in federal receipts. The out                                                                    
years  had $50  million  per year  through  2020. The  total                                                                    
construction  cost for  the Juneau  Access Project  was $285                                                                    
million,  with  $255 paid  for  by  the state.  Mr.  Otteson                                                                    
responded  that  that  Juneau Access  Project  had  faced  a                                                                    
change in  the financial plan.  The majority would  be spent                                                                    
with federal funds.                                                                                                             
                                                                                                                                
Senator Hoffman  queried the total construction  cost of the                                                                    
Juneau Access  Project. Mr. Otteson  replied that  the total                                                                    
construction cost would be approximately $500 million.                                                                          
                                                                                                                                
Senator Hoffman asked  for a brief synopsis of  the Knik Arm                                                                    
Bridge  and Toll  Authority  (KABATA)  project. Mr.  Otteson                                                                    
responded  that the  intent  was to  fund  the project  with                                                                    
resources. He  explained that there were  different types of                                                                    
bonding  that  would fund  the  project.  There would  be  a                                                                    
state-backed  bond  that  would  use tolls  as  revenue  for                                                                    
approximately  $300 million.  The second  aspect would  be a                                                                    
type   of  bonding   called  Transportation   Infrastructure                                                                    
Finance  and  Innovation  Act  (TIFIA),   which  was  a  low                                                                    
interest loan from the federal  government. The third aspect                                                                    
would come from  federal aid at a rate  of approximately $50                                                                    
million per year.                                                                                                               
                                                                                                                                
Senator  Hoffman  queried  the  total cost  of  KABATA.  Mr.                                                                    
Otteson   responded   that   the   total   cost   would   be                                                                    
approximately $900 million.                                                                                                     
                                                                                                                                
Senator  Olson wondered  if the  total cost  for KABATA  was                                                                    
$900  million.  Mr. Otteson  replied  $900  million was  the                                                                    
total cost  including the  risk adjustment  and construction                                                                    
engineering.                                                                                                                    
                                                                                                                                
Senator  Olson  understood  that  the  cost  of  KABATA  was                                                                    
significantly   higher  than   $900  million.   Mr.  Otteson                                                                    
responded that  the finance officer of  KABATA had estimated                                                                    
the total cost at $900 million.                                                                                                 
                                                                                                                                
Senator  Olson  felt  that KABATA  was  very  controversial,                                                                    
because of  the issues on  Government Hill in  Anchorage. He                                                                    
looked at  the Juneau Access  Project wondered if  the state                                                                    
would be  required to  provide $50  million for  the project                                                                    
until  2020. Mr.  Otteson responded  in the  affirmative. He                                                                    
explained  that there  had been  some financial  adjustments                                                                    
since  the  financial  budget  page  was  delivered  to  the                                                                    
legislature.                                                                                                                    
                                                                                                                                
Co-Chair  Meyer   understood  that   there  would   be  more                                                                    
discussion  on  KABATA, and  stressed  that  there was  some                                                                    
discussion about  a private company building  the bridge. He                                                                    
stated  that the  state  had since  decided  to finance  and                                                                    
build  KABATA, which  had reduced  the total  dollar amount.                                                                    
Mr.  Otteson  agreed, and  furthered  that  KABATA would  be                                                                    
funded two-thirds by tolls and  one-third by federal funding                                                                    
that came through the state.                                                                                                    
                                                                                                                                
10:26:32 AM                                                                                                                   
                                                                                                                                
Co-Chair Meyer  stressed that  the project  had been  in the                                                                    
works for  ten years.   Mr. Otteson replied that  the Denali                                                                    
road, which was obligated for  construction was due in large                                                                    
part to the recent infusion of funding.                                                                                         
                                                                                                                                
Mr. Otteson discussed slide 13, "Selected Projects (2)."                                                                        
                                                                                                                                
     Surface Transportation:                                                                                                    
                                                                                                                                
          -Asset Management: numerous bridges, pavement and                                                                     
          ferry and terminal projects                                                                                           
                                                                                                                                
          -Funding allocated to FMATS and AMATS                                                                                 
                                                                                                                                
          -Highway safety: numerous named and program type                                                                      
          projects (e.g., passing lanes at 13 Parks Hwy                                                                         
          locations last year)                                                                                                  
                                                                                                                                
Senator Olson  wondered how the number  of projects compared                                                                    
to the  amount of  funding for the  Statewide Transportation                                                                    
Improvement Program  (STIP) projects. Mr.  Otteson responded                                                                    
that STIP  was funding  through the federal  government, and                                                                    
had been greatly impacted by  the changing emphases that the                                                                    
federal  government   had  provided.  The  state   was  very                                                                    
adequately  funded on  the NHS  roads and  bridges, but  was                                                                    
greatly underfunded on all other classes of road.                                                                               
                                                                                                                                
Senator  Olson  wondered  why   there  were  large  proposed                                                                    
projects like KABATA  and the Juneau Access  Project, if the                                                                    
STIP  money was  not substantial.  Mr. Otteson  replied that                                                                    
the  large  projects began  almost  20  years ago,  and  had                                                                    
incurred costs  of over $10  million. He stated that  it was                                                                    
almost as expensive  to shut down the projects as  it was to                                                                    
complete the projects.                                                                                                          
                                                                                                                                
Senator Olson wondered  what DOT/PF was doing  to manage the                                                                    
declining STIP  funds for state  roads. Mr.  Otteson replied                                                                    
that he had  met with some people from  Kotzebue, and stated                                                                    
that  there  was approximately  $14  million,  but the  cost                                                                    
estimate for  the road there had  increased substantially to                                                                    
approximately $30 million to complete the project.                                                                              
                                                                                                                                
Senator Olson queried the status  of Umiat Road. Mr. Otteson                                                                    
replied that Linc Energy had  asked DOT/PF to halt the work,                                                                    
in order to  assess the drilling on their  leases. He stated                                                                    
that Linc Energy would like the road built with a pipeline.                                                                     
                                                                                                                                
Senator  Olson remarked  that  DOT/PF  had proposed  landing                                                                    
fees at some of the  airports. He understood that there were                                                                    
difficult financial  times. He  stated that the  people that                                                                    
were  most dependent  on  aviation  transportation lived  in                                                                    
rural Alaska, who already had  the highest cost of living in                                                                    
the state.  He wondered  if there  was also  a consideration                                                                    
for tolling the roads  and port. Commissioner Kemp responded                                                                    
that DOT/PF was not pursuing landing fees at airports.                                                                          
                                                                                                                                
10:33:22 AM                                                                                                                   
                                                                                                                                
Co-Chair  Meyer  complimented  the efforts  of  DOT/PF,  and                                                                    
their work with the communities.  He wondered why the Alaska                                                                    
Marine Highway was  not a focus on  the budget. Commissioner                                                                    
Kemp  replied  that the  culture  around  the Alaska  Marine                                                                    
Highway was in  transition. He felt that the  captain of the                                                                    
marine  highway had  a nice  vision. He  furthered that  the                                                                    
system   could  be   fine,  as   long  as   enough  deferred                                                                    
maintenance funds were utilized.                                                                                                
                                                                                                                                
Mr.  Otteson  furthered  that most  of  the  marine  highway                                                                    
system   requests   were    under   the   category,   "Asset                                                                    
Management."                                                                                                                    
                                                                                                                                
Senator  Hoffman queried  the status  of the  transportation                                                                    
route  of   the  marine   highway  between   Metlakatla  and                                                                    
Ketchikan.  He wondered  if the  road  would be  used for  a                                                                    
shorter  connection  between  the Metlakatla  residents  and                                                                    
Ketchikan.  Commissioner Kemp  responded that  the road  and                                                                    
terminal  were  currently  operational,  which  resulted  in                                                                    
marine highway savings of approximately $300,000 per year.                                                                      
                                                                                                                                
Senator Hoffman  announced that the community  of Metlakatla                                                                    
hoped that  a shorter route  would result in  growing public                                                                    
services.  Commissioner Kemp  replied that  the extra  hours                                                                    
for running the ferry was not being pursued.                                                                                    
                                                                                                                                
Senator Hoffman  wondered if that  was a result  of problems                                                                    
with negotiations. Mr. Otteson  replied that operating three                                                                    
terminals was too great a burden.                                                                                               
                                                                                                                                
^FY15 GOVERNOR'S BUDGET OVERVIEW: COURT SYSTEM                                                                                
                                                                                                                                
10:40:10 AM                                                                                                                   
                                                                                                                                
DOUG WOOLIVER, DEPUTY  ADMINISTRATIVE DIRECTOR, ALASKA COURT                                                                    
SYSTEM,  discussed  the   PowerPoint  presentation,  "Alaska                                                                    
Court  System, Senate  Finance,  Capital Projects  Overview"                                                                    
(copy  on  file). He  stated  that  each year  the  governor                                                                    
included some Court System requests as a courtesy.                                                                              
                                                                                                                                
Mr. Wooliver  looked at  slide 2, "SB  119 Court  Projects -                                                                    
$6,900,000."                                                                                                                    
                                                                                                                                
     Electronic Filing/Records Management System                                                                                
                                                                                                                                
     Deferred Maintenance Projects                                                                                              
                                                                                                                                
Mr.    Wooliver    highlighted    slide    3,    "Electronic                                                                    
Filing/Records Management System - 52410."                                                                                      
                                                                                                                                
    $4.4 million for third phase of multi-year project                                                                          
                                                                                                                                
     Electronic transmission of documents with goal of                                                                          
     moving to "paperless"                                                                                                      
                                                                                                                                
     Electronic exchange of data between justice agencies                                                                       
     (Law, DPS, Munis, Cities)                                                                                                  
                                                                                                                                
     Improved justice system efficiencies and potential                                                                         
     cost savings                                                                                                               
                                                                                                                                
Mr.  Wooliver  displayed  slide  4,  "Deferred  Maintenance,                                                                    
Renewal, Repair and Equipment - 54564."                                                                                         
                                                                                                                                
     SB119 includes $2.5 million for court projects                                                                             
                                                                                                                                
     Addition of $5.0 million needed to eliminate remaining                                                                     
     project backlog                                                                                                            
                                                                                                                                
Mr.  Wooliver  looked  at slide  5,  "Deferred  Maintenance,                                                                    
Renewal, Repair and Equipment - 54564."                                                                                         
                                                                                                                                
     Anchorage Boney Courthouse - 58746                                                                                         
                                                                                                                                
     Palmer Courthouse - 45582                                                                                                  
                                                                                                                                
     Sitka Court and Office Building - 58745                                                                                    
                                                                                                                                
     Kotzebue Armory - 58749                                                                                                    
                                                                                                                                
     Juneau Dimond Courthouse - 58744                                                                                           
                                                                                                                                
     Kodiak Court and Office Building - 58748                                                                                   
                                                                                                                                
Mr. Wooliver discussed slide 6, "Court Projects not                                                                             
included in SB 119."                                                                                                            
                                                                                                                                
     Juneau Superior Court Remodel                                                                                              
                                                                                                                                
     Court Security Projects                                                                                                    
                                                                                                                                
     Statewide Remodel Projects                                                                                                 
                                                                                                                                
     Court Communications Equipment                                                                                             
                                                                                                                                
     Replace Worn Furnishings and Repair Specialized                                                                            
     Finishes in Public Use Spaces                                                                                              
                                                                                                                                
     Statewide Building Code and Energy Upgrade for Court                                                                       
     Buildings                                                                                                                  
                                                                                                                                
     Conversion of Audio Records to Digital Format - Phase                                                                      
     I                                                                                                                          
                                                                                                                                
Mr. Wooliver highlighted slide 7, "Juneau Superior Court                                                                        
Remodel - 61533(CAPSIS)."                                                                                                       
                                                                                                                                
     $1,201,200 - Addition of courtroom and grand jury                                                                          
     hearing room                                                                                                               
                                                                                                                                
          -Current hearing room too small to accommodate                                                                        
          grand jury                                                                                                            
                                                                                                                                
     High number of superior court filings per superior                                                                         
     court judge                                                                                                                
                                                                                                                                
     Increase operational efficiency and reduce delays in                                                                       
     cases and hearings                                                                                                         
                                                                                                                                
     Court system's second highest priority capital project                                                                     
                                                                                                                                
Mr. Wooliver looked at slide 8, "Court Security Projects -                                                                      
61536 (CAPSIS)."                                                                                                                
                                                                                                                                
     Security projects  total $8.6 million for  a statewide,                                                                    
     multi-year project                                                                                                         
                                                                                                                                
     Physical  security for  public, judges,  staff, jurors,                                                                    
     and others court users                                                                                                     
                                                                                                                                
     Integrate security  operations and technology  with the                                                                    
     architecture                                                                                                               
                                                                                                                                
Mr. Wooliver discussed slide 9, "Court Security Projects                                                                        
(cont.) - 61536 (CAPSIS)."                                                                                                      
                                                                                                                                
                                                                                                                                
     Access control and physical barriers                                                                                       
                                                                                                                                
          -Badging systems, screening equipment, single                                                                         
          point of entry, cameras                                                                                               
          -Segregated prisoner delivery paths and elevators                                                                     
          and security fencing around court perimeters                                                                          
                                                                                                                                
     Ballistic  shielding for  judicial benches  and clerks'                                                                    
     counters                                                                                                                   
                                                                                                                                
     Duress alarms, surveillance systems, and holding cells                                                                     
                                                                                                                                
Mr. Wooliver highlighted slide 10, "Statewide Remodeling                                                                        
Projects."                                                                                                                      
                                                                                                                                
     Reconstruct  judicial benches  and clerical  work areas                                                                    
     to accommodate new technology                                                                                              
                                                                                                                                
     Minor  remodels to  address  specific  needs in  courts                                                                    
     throughout the state                                                                                                       
                                                                                                                                
10:45:53 AM                                                                                                                   
                                                                                                                                
Mr. Wooliver discussed slide 11, "Court Communications                                                                          
Equipment - 61539 (CAPSIS)."                                                                                                    
                                                                                                                                
     Replacement   of  equipment   used  to   capture  audio                                                                    
     recordings of court proceedings                                                                                            
          -The audio record is the official court record                                                                        
          and is critical to case processing                                                                                    
                                                                                                                                
     Replacement of telephone systems which are beyond                                                                          
     their useful lives and are no longer supported by                                                                          
     their manufacturers                                                                                                        
          -These systems are relied upon to conduct                                                                             
          telephonic proceedings, communicate with jurors,                                                                      
          and respond to public inquiries                                                                                       
                                                                                                                                
Mr.   Wooliver   highlighted   slide   12,   "Replace   Worn                                                                    
Furnishings and Specialized Finishes  in Public Use Spaces -                                                                    
61541 (CAPSIS)."                                                                                                                
                                                                                                                                
     Upgrades and repairs for jury rooms, customer service                                                                      
     areas, courtrooms, and libraries                                                                                           
                                                                                                                                
     Furnishings worn, damaged, and uncomfortable                                                                               
                                                                                                                                
     Finishes unsafe, unsightly, and losing structural                                                                          
     integrity                                                                                                                  
                                                                                                                                
Mr. Wooliver  looked at slide  13, "Statewide  Building Code                                                                    
and Energy Upgrade for Court Buildings - 61542 (CAPSIS)."                                                                       
                                                                                                                                
     Earthquake bracing                                                                                                         
                                                                                                                                
     Energy efficient light fixtures                                                                                            
                                                                                                                                
     Americans with Disabilities (ADA) compliant doors                                                                          
                                                                                                                                
     Other miscellaneous upgrades for code and ADA                                                                              
     compliance                                                                                                                 
                                                                                                                                
Mr.  Wooliver  discussed  slide  14,  "Conversion  of  Audio                                                                    
records to Digital Format - Phase 1 - 61543 (CAPSIS)."                                                                          
                                                                                                                                
     Preserve original electronic court records                                                                                 
                                                                                                                                
     Degradation of media (cassette tapes)                                                                                      
                                                                                                                                
     Transfer media to server                                                                                                   
                                                                                                                                
Co-Chair Meyer  remarked that he had  some questions related                                                                    
to some phase  projects. He stressed that  the committee was                                                                    
trying to avoid "phased" projects.                                                                                              
                                                                                                                                
Senator   Bishop  understood   the  concern   regarding  the                                                                    
conversion of audio files to a more upgraded system.                                                                            
                                                                                                                                
SB 119 was HEARD and HELD in committee for further                                                                              
consideration.                                                                                                                  
                                                                                                                                

Document Name Date/Time Subjects
021814 - SB 119 Alaska Court System Senate Finance Capital Projects - FY15 Final.pdf SFIN 2/18/2014 9:00:00 AM
SB 119
021814 DHSS Capital Budget Presentation Final.pdf SFIN 2/18/2014 9:00:00 AM
SB 119
021814 DOT Cap Budget for SEN FIN Feb 2014.pdf SFIN 2/18/2014 9:00:00 AM
SB 119
021814 UofA FY15 Senate Finance-FINAL.pdf SFIN 2/18/2014 9:00:00 AM
SB 119